Body material : | Aluminum Alloy+PC cover |
Power supply: | The solar panel(Monocrystalline 2.5V /120MA) |
Battery: | Lithium battery 1000MAH*3.2V |
LED: | Ultra-bright diameter 5mm*6PCS |
LED Color: | White Green Red Yellow Blue |
Flashing model: | flashing or constant |
Working hours: | 140 hrs for flashing modes,40hrs for constant modes |
Visual distance: | 1000m(approx) |
Waterproof: | IP68 |
Load capacity | >30T(can be installed in the middle of the road) |
Size: | Ф123*45mm |
Weight: | 30kgs/ctn,30pcs/ctn |
Life span: | more than 5 years |
Working Temperature | -20 °C~ + 70°C |
waterproof | IP68 |
Please note – The primary objective of parking lot design is to provide safe, efficient vehicular access to parking stalls that serve businesses, commuter lots and residential facilities. For businesses and commuter lots, the design must consider the use of the pavement by
A parking lot (American English) or car park (British English), also known as a car lot, is a cleared area that is intended for parking vehicles. Usually, the term refers to a dedicated area that has been provided with a durable or semi-durable surface. In most countries where cars are the dominant mode of transportation, parking lots are a
Dual Function, Double Sided, Solar Powered Flash Rate: 60 Times/Minute Power: 0.4 Watt Solar Panel Energy: 2.4 Volt 1600 mAh Illumination: 2 High Intensity Super Bright LEDs Effective Intensity: 6 Candela Lens Cover Material: Polycarbonate Overcharge: Protection
Road surface marking is any kind of device or material that is used on a road surface in order to convey official information; they are commonly placed with road marking machines (or road marking equipment, pavement marking equipment).They can also be applied
Manual Notice 2004-1 From: Carlos A. Lopez, P.E Manual: Pavement Marking Handbook Effective Date: August 01, 2004 Purpose This handbook provides information on material selection, installation, and inspection guidelines for pavement markings. It is
Parking Lot and Site Development Bike Racks Bollards Convex Mirrors Humps, Corner Guards, and Controllers Parking Blocks Parking Posts Parking Stencils Pot Hole Repair Speed Bumps Truncated Domes and Mats Pavement Marking and Striping Stencils
Markers and Adhesives Adhesive Markers Parking Lot Products Chalk Cold Patch Convex Mirrors Parking Blocks Speed Bumps Speed Humps Stencils Striping & Marking Paint Striping Supplies Pavement Markings Glass Beads Preformed Thermoplastic Tape
Pavement markers and pavement marking tape are attached to asphalt and concrete roadways and walkways to mark off lanes, sidewalks, parking spots, and right-of-ways. Marking tape is flush to the pavement and can be paved over.
Delineators / Pavement Markers Delineators Pavement Markers Parking Lot Accessories Safety Tapes 911 Emergency Signs Reflective Sheeting and Films Sign Making Materials/Supplies Non-Reflective Painted White Aluminum Sign Blanks.080 Bare $500 or
C.1—Pavement joint details Appendix D—Parking lot geometrics, p. 330R-27 D.1—Parking requirements D.2—Entrances and exits D.3—Truck-parking facilities D.4—Additional information Appendix E—SI (metric) tables, p. 330R-31 CHAPTER 1—GENERAL
Our Solar Powered Road Markers are dusk to dawn LED lights that can work up to 5 days on one charge. Since these road markers do not use conventional energy and are solar powered, they must be used outdoors (in sunlight) to establish a charge. This product
High Intensity - Solar Powered Flash Rate: 60 Times/Minute Power: 1.5 Watt Solar Panel Energy: 4 Volt 4500 mAh Illumination: 9 High Intensity Super Bright LEDs Effective Intensity: 6 Candela Lens Material: Polycarbonate Base Material: ABS Overcharge: Protection
EXPECTED USEFUL LIFE TABLE SITE SYSTEMS FAMILY ELDERLY ACTION = REPLACE 50+ = "long-lived" systems CONSTR. CONSTR. UNLESS NOTED Basketball Courts 15 25 Built Improvements (playgrounds/site furniture) 20 20 Catch Basin 40 40 Cold
Parking Management: Strategies, Evaluation and Planning Victoria Transport Policy Institute 2 Introduction Parking is an essential component of the transportation system. Vehicles must park at every destination. A typical automobile is parked 23 hours each day
ASTM's road and paving standards provide the specifications and test methods pertinent to the material, physical, mechanical, performance, and application requirements of road surfaces and pavements. These geotechnical surfaces are laid down on specified areas